Wharton-Smith provided Construction Management At Risk services for the construction of two 7.5MG Ground Storage Tanks (GST), conversion of a 1.5MG GST, a concrete chlorine contact chamber, a reclaimed pump station, a new electrical building and new generators, with related piping, electrical and I&C work. The GST sizes were 170’-0” inside diameter with 44’-2” SWD.
Project Details
LOCATION
Kissimmee, Florida
CLIENT
Toho Water Authority
SIZE
7.5MG Ground Storage Tanks
CONSTRUCTION COST
$23.4 million