Our Wharton-Smith Orlando Water Division began production on December 2019 for the City of Orlando’s Iron Bridge RWRF Diffused Aeration Replacement project. The team is working on the installation of six temperature elements and transmitters on existing air piping, along with the removal and disposal of grit, and replacement of existing fine bubble plate diffusers in four aeration zones. Working alongside Tetra Tech, construction is expected to be finalized June 2021.
See Project Gallery below.
Project Details
LOCATION
Orlando, Florida
CLIENT
City of Orlando
CONSTRUCTION COST
$1.7 million