The Pascagoula High School Performing Arts Center was recently completed in February 2020 for the Pascagoula-Gautier School District. The $14.7 Million facility is one of the most high-tech performing arts centers on the Mississippi Gulf Coast. The two-story, 43,212 SF center has the ability to be operated entirely by an iPad and features a full movie theater with a projection system and surround sound and an expandable stage with space for a 160-piece band. The center is home to a beautifully designed auditorium with fixed audience seating. It has 771 seats, an orchestra pit, acoustical shell towers, theatrical rigging and lighting, and audio-visual equipment. The facility includes ticket booths, a concession stand, catering room, set building room, student classrooms, technical and recording rooms, greenroom, and a backstage area with dressing rooms and showers. The center hosts events such as dance recitals, drama programs, forensic team debates, and local artist performances.
See photos below.
Project Details
LOCATION
Pascagoula, MS
CLIENT
Pascagoula-Gautier School District
SIZE
43,212 s.f.
CONSTRUCTION COST
$14.7 million