The Winter Springs WTP #1 Upgrades project involved improvements to the Winter Springs WTP #1 including: furnishing and installing the new anionic ion exchange system (consisting of three ion exchange vessels); a spent regenerate wastewater system (to support the ion exchange system); a new chemical feed system (consisting of a sodium hypochlorite and corrosion inhibitor); a new 750KW generator (including a new fuel storage tank and fuel piping); a new pre-engineered metal building structure; installation of a high service pump; upgrades to well pump power; control upgrades; modifications to the operations building; yard piping and flange piping; electrical updates; site work; a new electrical room; and SCADA instrumentation and controls updates.